To provide additional electric service to the rapidly expanding UNC campus,
a new substation was required. The only site that met the location requirements
was situated on a small site between an existing four-story parking garage
and student apartments. The site had very limited access and a forty-foot
difference in elevation from the front to the back of the site.
Major utilities and a 72" storm drain were also located on the site.
In order to provide an adequate platform for the substation and to provide
an aesthetically acceptable project, a series of concrete walls designed
to match the garage architecture and extensive site grading created a
facility that met the goals of the Power Company and the visual and functional
requirements of the University. |